  • Maxcess International is a leading global manufacturer of web converting equipment
  • 17+ facilities across the US, EU, and Asia
  • After acquiring 2 complementary companies, management wanted to update the newly acquired facilities
  • 3 facilties were identified for upgraded lighting

Mansfield, Texas

  • Built in 1998
  • 27,000 ft2 footprint

 

Appleton, WI

  • Built in 1996
  • 20,000 ft2 footprint

 

Wauconda, IL

  • Built in 1992
  • 20,000 ft2 footprint
130 High Bay Fixtures
43.3 Foot Candle Increase
35 Legacy Fixtures Eliminated
3 Facilities Across 3 States

All 3 facilities used a mixture of include 200W T5 CFL, and 400W HPS.  The maintenance team wanted to utilize the same fixture across all the facilities

RHB SeriesThe facility manager wanted an efficient, high lumen output. They selected a 200W, 5000K configuration with 0-10V dimming.